16
Keston Heat - Frame & Header Kits
6.2 BOILER MOUNTING
7 HEADER KIT ASSEMBLY
7.1 FITTING MIXING HEADER AND BLANKING FLANGES
1. Fit the mixing header and blanking anges in the chosen positions, with the bolts, washers and seals supplied.
Note. Mixing header can be located either LHS or RHS of the headers.
1
Mixing Header Blanking Flange
2. Ensure the two boiler bottom xing brackets
are screwed to the frame or wall.
2
1. As appropriate mount the boilers onto either the wall plates or the side
by side frame kit.